Contact us

Building plot for sale with villa project ideas of UNStudio

8.500.000 €

Reference

NP1789

Bedrooms

9

Bathrooms

9

Plot

10.451 m²

Built

2.613 m²

This is a unique and private gated community set within the grounds of La Reserva Club. There will be seven extraordinary villas providing extensive accommodation and guest facilities, screening rooms and spa, inside and outside swimming pools, garaging, staff quarters, and landscaped gardens, amongst much more. This villa was designed by UNStudio. UNStudio, founded in 1988 by Ben van Berkel and Caroline Bos, is an international architectural design studio specialising in architecture, interior architecture, product design, urban development and infrastructural projects. The name UNStudio, stands for United Network Studio, referring to the collaborative nature of the practice. In 2009, UNStudio Asia was established, with office located in Shanghai, China. In 2014 they opened their third office in Hong Kong. AREA: Interior 1,526 m2, Terrace 704 m2, Plot 10,320 m2; Master Suite 1, Junior Suite 5, Guest Suites 2, Bathrooms 8, Staff / Bedroom 1, Covered Parking 3, Uncovered Parking 3; Gym, Spa, Outdoor Swimming Pool, Indoor Swimming pool, Pool House, Wine Cellar, 2 Bedroom Guest House (Optional), Studio / Art Room (Optional), Multipurpose Room (Optional), Safe Room

Property Map
Building plot for sale with villa project ideas of UNStudio
Get more info
Additional Features
  • Amenities near
  • Close to schools
  • Sea view
  • Country view
  • Gated community
  • Inside Golf Resort
  • Golf view
  • Security service 24h
  • Close to sea / beach
  • Close to golf
  • Panoramic view
Plot in The Seven, La Reserva, Sotogrande
8.500.000 €
  • Ref.

    NP1789
  • Bedrooms

    9
  • Bathrooms

    9
  • Built

    2.613 m²
  • Plot

    10.451 m²
  • Pool

    Private
  • Garden

    Private
  • Garage

    Private
  • EPC

    In process
Property Map
Building plot for sale with villa project ideas of UNStudio
Get more info
Similar Properties
Similar Searches